NEC Express5800/1080Xd Guia do Utilizador Página 8

  • Descarregar
  • Adicionar aos meus manuais
  • Imprimir
Vista de página 7
USERS_GUIDE_1080XD_hw
1-8
1.3. INSTALLATION AND CONNECTION
1.3.1 Installation of Rack
A maintenance engineer installs a rack.
1.3.2 Installation/Removal of Cabinet
A maintenance engineer installs/removes a cabinet to/from a rack.
1.3.3 Connection
A maintenance engineer connects the Express sever and the peripheral devices.
Vista de página 7
1 2 3 4 5 6 7 8 9 10 11 12 13 ... 94 95

Comentários a estes Manuais

Sem comentários